More
  • BAOJIYEYA

Model/PN:JB1885-77

P/N : JB 1885-77, HIGH PRESSURE HOSE 10?-800, FOR BAOJICITY BOP HANDLING SYSTEM FY-50Y

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *3.44

Model/PN:JB1885-77

P/N : JB 1885-77, HIGH PRESSURE HOSE 10?-620, ONE END 90?FOR BAOJI CITY BOP HANDLING SYSTEM FY-50Y

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *7.01

Model/PN:JB1885-77

P/N : JB 1885-77, HIGH PRESSURE HOSE 10?-550 FOR BAOJICITY BOP HANDLING SYSTEM FY-50Y

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *3.37

Model/PN:H8

P/N : H8-62,63,65,66M, FAST ADAPTER NPT 1 FOR BAOJI CITY BOP HANDLING SYSTEM FY-50Y

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *08.33

Model/PN:FY-5YH2

HYDRAULIC BOP LIFTING DEVICE, INCLUDING CCS INSPECTION

Brand:

Unit: EA

Lead Time: 55 Days
Price(USD)

$ *3333.33

Model/PN:FY-5YH2

LIFTING DEVICE OF HYDRAULIC BOP

Brand:

Unit: EA

Lead Time: 55 Days
Price(USD)

$ *8125.00

Model/PN:ROPE

SPARE ROPE WITH (WIRE CLIPS GB5976-86)

Brand:

Unit: SET

Lead Time: 30 Days
Price(USD)

$ *47.22

Model/PN:YM16-IIB1

YM16-IIB1 HYDRAULIC CATHEAD,API 8C PULLING TOOLS YM SERIES HYDRAULIC CATHEAD, DRILLING RIG SPARE PAR...

Brand:

Unit: SET

Lead Time: 30 Days
Price(USD)

$ *340.28

Model/PN:FYQ-50(HF)

BOP CRANE COMPLETE WITH CONTROL, UNIT CAPACITY 50 TON

Brand:

Unit: SET

Lead Time: 45 Days
Price(USD)

$ *9861.11

Model/PN:FY 50B-10.00

P/N : FY 50B-10.00, HYDRAULIC SYSTEM FOR BAOJI CITY BOP HANDLING SYSTEM FY-50Y

Brand:

Unit: EA

Lead Time: 35 Days
Price(USD)

$ *7708.33