 | Model/PN:DEN220-DA3215-12/AC |
ELECTRICAL CONTROL PANEL Brand: |
Unit: PCS
Lead Time: 15 Days | Price(USD)
$ *497.40 |
| |
 | Model/PN:CONTROL PANEL |
HYDRAULIC CHOKE CONTROL PANEL FOR 3.1/8”-5.000PSI DRILLING CHOKE AS PAR API-16C LAST EDITION; COMPLE... Brand: |
Unit: EA
Lead Time: 30 Days | Price(USD)
$ *548.61 |
| |
 | Model/PN:ADPI-01 |
CONTROL PANEL INTERFACE BOARD Brand: |
Unit: EA
Lead Time: 7 Days | Price(USD)
$ *38.54 |
| |
 | Model/PN:E2N1600 R1600 PR121/P-LI FHR 3P |
SWITCH GEAR ABB SACE L=1600A U=690V Brand: |
Unit: EA
Lead Time: 10 Days | Price(USD)
$ *378.30 |
| |
 | Model/PN:930.83 |
SWITCH PRESSURE AIR DIFFERENTIAL 50-500PA ,930.83 Brand: |
Unit: EA
Lead Time: 1 Days | Price(USD)
$ *3.44 |
| |
 | Model/PN:REMOTE PANEL |
NEED REMOT PANAL COMPLETE SET Brand: |
Unit: EA
Lead Time: 7 Days | Price(USD)
$ *819.44 |
| |
 | Model/PN:112400570 |
CONTROL PLATE ASSEMBLY Brand: |
Unit: EA
Lead Time: 30 Days | Price(USD)
$ *2.92 |
| |
 | Model/PN:TCP-GX-03 |
CHOKE VALVE HOSE FOR SHENKAI CHOCK MANIFOLD CONTROL PANEL REDFOX RF-4500-C AND RF-2500-C LIFT STATIO... Brand: |
Unit: EA
Lead Time: 45 Days | Price(USD)
$ *9.44 |
| |
 | Model/PN:TCP-GX-02 |
TRANSMITTER HOSE FOR SHENKAI CHOCK MANIFOLD CONTROL PANEL TCP-0214-01BB Brand: |
Unit: EA
Lead Time: 45 Days | Price(USD)
$ *0.76 |
| |
 | Model/PN:TCP-GX-01 |
AIR SOURCE HOSE FOR SHENKAI CHOCK MANIFOLD CONTROL PANEL TCP-0214-01BB Brand: |
Unit: EA
Lead Time: 45 Days | Price(USD)
$ *0.76 |
| |