More
More
  • BAOWO
  • BOMCO
  • EMSCO
  • HONGHUA
  • JINGBO
  • LS
  • NOV
  • RG
  • RUSHI
  • RUTONG
  • SHANCHENG
  • SIDA
  • SJPETRO
  • TIANHE
  • TOPLAND

Model/PN:1021

MASTER BUSHING LIFTER SLINGSWITH 2 HOCKS FOR JIANGSU RUTONG ROTARY TABLE MODEL ZP-375

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *08.33

Model/PN:LX 105.08.70.00

MASTER BUSHING (PN: LX 105.08.70.00) FOR DPS ONLY

Brand:

Unit: EA

Lead Time: 40 Days
Price(USD)

$ *385.42

Model/PN:ZP495

RST495-3G HOLE DIA.1257.4MM MAXIMUM STATIC LOAD 1,000 SHORT TONS MAXIMUM TORQUE 61,000 NM. MAX...

Brand:

Unit: EA

Lead Time: 50 Days
Price(USD)

$ *66666.67

Model/PN:RST495-3G

RST495-3G HOLE DIA.1257.4MM MAXIMUM STATIC LOAD 1,000 SHORT TONS MAXIMUM TORQUE 61,000 NM. MAX...

Brand:

Unit: EA

Lead Time: 50 Days
Price(USD)

$ *73263.89

Model/PN:105.06.14

SEAL, FOR ROTARY TABLE, MODEL: RT275, MAKE: NOV, P/N: 105.06.14

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *1.25

Model/PN:GB6170-86-M20

NUT, M20, FOR ROTARY TABLE, MODEL: ZP375, MAKE: NOV, P/N: GB6170-86-M20

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *.08

Model/PN:GB5782-86-M20X80

BOLT, M20X80, FOR ROTARY TABLE, MODEL: ZP375, MAKE: NOV, P/N: GB5782-86-M20X80

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *.04

Model/PN:GB855-88-20

WASHER, 2O, FOR ROTARY TABLE, MODEL: ZP375, MAKE: NOV, P/N: GB855-88-20

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *.08

Model/PN:105.54.04

BUSHING, FOR ROTARY TABLE, MODEL: ZP375, MAKE: NOV, P/N: 105.54.04

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *302.08

Model/PN:GB32.1-88-M20X45

SCREW, WITH HEAD HOLES, FOR ROTARY TABLE, MODEL: ZP-375, MAKE: NOV, P/N: GB32.1-88-M20X45

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *.08

Prev Page12345...  47Next PageTotal 47 Pages GO