 | Model/PN:Z03011400018AA |
AIR INLET PIPE Brand: |
Unit: EA
Lead Time: 30 Days | Price(USD)
$ *2.50 |
| |
 | Model/PN:100 OD x 71mm ID |
CENTRE TUBE 100 OD X 71MM ID GRADE 316 STAINLESS STEEL Brand: |
Unit: EA
Lead Time: 20 Days | Price(USD)
$ *0069.44 |
| |
 | Model/PN:QB/HTQ-83 |
PIPE SLEEVEΦ10 ( INTERMRDIATE SHAFT) Brand: |
Unit: EA
Lead Time: 50 Days | Price(USD)
$ *.68 |
| |
 | Model/PN:PIPE |
PIPE, METALLIC, SIZE: 3/4" NPS, ASTM A106 GR.B, SMLS, PE, SCH 80, SRL, NACE MR-0175/ISO15156, ASME B... Brand: |
Unit: MTR
Lead Time: 15 Days | Price(USD)
$ *.25 |
| |
 | Model/PN:PIPE |
PIPE, METALLIC, SIZE: 3" NPS, ASTM A106 GR.B, SMLS, BE, SCH 40, DRL, NACE MR-0175/ISO15156, ASME B36... Brand: |
Unit: MTR
Lead Time: 15 Days | Price(USD)
$ *6.32 |
| |
 | Model/PN:PIPE |
PIPE, METALLIC, SIZE: 4" NPS, ASTM A106 GR.B, SMLS, BE, SCH 40, DRL, NACE MR-0175/ISO15156, ASME B36... Brand: |
Unit: MTR
Lead Time: 15 Days | Price(USD)
$ *3.61 |
| |
 | Model/PN:PIPE |
PIPE, METALLIC, SIZE: 8" NPS, ASTM A106 GR.B, SMLS, BE, SCH 20, DRL, NACE MR-0175/ISO 15156, ASME B3... Brand: |
Unit: MTR
Lead Time: 15 Days | Price(USD)
$ *3.58 |
| |
 | Model/PN:PIPE |
PIPE, 6IN 0.344IN WT, API5L X60,EXTERNALLY COATED, 60 MIL EXTRUDED POLY, SMLS,
SPEC.D-C001 REV 1, 4... Brand: |
Unit: TON
Lead Time: 40 Days | Price(USD)
$ *276.04 |
| |
 | Model/PN:PIPE, 3" |
PIPE, 3", 40 FT, API 5L PSL 2, GR. BN, SMLS, MNPT, SCH 40, B36, 10 M, GALV Brand: |
Unit: T
Lead Time: 10 Days | Price(USD)
$ *138.89 |
| |
 | Model/PN:PIPE, 2" |
PIPE, 2", 40 FT, API 5L PSL 2, GR. BN, SMLS, MNPT, SCH 80, B36, 10 M, GALV Brand: |
Unit: T
Lead Time: 10 Days | Price(USD)
$ *138.89 |
| |