PS80-06B

PAD, BRAKE - MFG: BAOJI HONGXIANG P/N# HH PS80-06B, BRAKE PAD PS80-06B DRAWWORKS BRAKE BANDS DRILLING SPARE PARRTS

US$ *9.48EA

Model/PN: PS80-06B

Brand: TOPLAND

Standard: API

Lead Time: 10 days

Warranty: 12 Months

Place of Origin: China

Payment Method: T/T

Application: Oilfields equipments & Spares

Packaging: Export Standard Packing

HS code: 8431499900

Purchase Quantity

Add to Wishlist

 

Product Details


Topland supplies all types of oil drilling equipment like ZJ30, ZJ40, ZJ50, ZJ70, ZJ90 and rig parts: Mud pump, Hook, Rotary Table, Swivel, Crown block, Travelling Block, iron roughneck, etc. Our products have certificated by international institutions, API and ISO, GOST. the quality is guaranteed. We always stick to the principle of ensuring quality and servicing customers.

We Supply Drawworks Parts & Expendables For:

 

Landing Rig
(China Made)
ZJ40L/40L, ZI40LDB. ZJ40D,ZJS0L, ZJ50LDB. ZJ50D, ZJ50DB.2170L, ZJ70LDB,ZJ70D, 2J70DB
Truck/Trailer
Mounted Rig
(China Made:
SJ,RG ZYT)
ZJ10. ZJ15. ZJ20, ZJ30, ZJ40
Workover Rig
(China Made:
SJ, RG ZYT)
XJ250, XJ350, XJ450, XJ550, XJ650, XJ750

 

NATIONALOILWELLCONTINENTAL EMSCOIDECOGARDNER-DENVER
370/370-E500C-3-II900500/500-E
610/610-E660/660-EC-3-III1200700
80-B/80-UE700/700-EC-2-II1700800
110-M/110-UDBM760/760-EC-2-III21001100
110-UE/110-UDBE840-EC-1-II30001500
1320-M/1320-UDBM860/860-EC-1-III 2100
1320-UE/1320-UDBEM-2000D-3-II 3000-E
1625-M/1625-UDBME-2000D-3-III  
1625-DE/1625-UDBEM-3000/M-3000-UDBD-2  
2040-UDBEE-3000/E-3000-UDBD-1  




Related Products

Model/PN:FN071-6DQ....

P/N : FN071-6DQ.6K.V7P1 #153475 , CONDENSER FAN ASSEMBLY P/N: 220.06.923

Brand:

Unit: EA

Lead Time: 5 Days
Price(USD)

$ *46.88

Model/PN:V  BELT L

COMBINED V  BELT L:7620 MM 5ZV25J/1V

Brand:

Unit: EA

Lead Time: 20 Days
Price(USD)

$ *82.29

Model/PN:V  BELT L

COMBINED  V - BELT   L=7620MM  2*4ZV25J/1

Brand:

Unit: EA

Lead Time: 20 Days
Price(USD)

$ *47.57

Model/PN:59000121

O-RING KIT;PINLET

Brand:

Unit: EA

Lead Time: 50 Days
Price(USD)

$ *.47

Model/PN:04089-0025...

TAPE,ADHESIVE, NON-ELEC:PKNG,48MM WD,0.1

Brand:

Unit: EA

Lead Time: 14 Days
Price(USD)

$ *.94

Model/PN:ASF802

LOCK:ELECTROMAGNETIC,12VDC,110MA,HOLDING FORCE-1000KG,205X35X40MM,MFR:DAHUA

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *5.78

Model/PN:416751-02

RELEASE SPRING

Brand:

Unit: NO

Lead Time: 10 Days
Price(USD)

$ *.21

Model/PN:BELT

COMBINED V BELT L:7620 MM 5ZV25J/1V

Brand:

Unit: NO

Lead Time: 30 Days
Price(USD)

$ *85.76

Model/PN:OIL SEAL

RADIAL SHAFT SEAL

Brand:

Unit: NO

Lead Time: 30 Days
Price(USD)

$ *.39

Model/PN:BELT

COMBINED V - BELT L=7620MM 2*4ZV25J/1

Brand:

Unit: NO

Lead Time: 30 Days
Price(USD)

$ *03.82

Model/PN:PS80-06B

PAD, BRAKE - MFG: BAOJI HONGXIANG P/N# HH PS80-06B, BRAKE PAD PS80-06B DRAWWORKS BRAKE BANDS DRILLIN...

Brand:

Unit: EA

Lead Time: 10 Days
Price(USD)

$ *9.48

Model/PN:MFT-E4

COMPLETE TIRE WITH SEAL SIZE 40R57 FOR  MOVE PACKAGE (TITAN STYLE : MFT-E4)

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *4038.80