CHOCK MANIFOLD 2 9/16

5000 PSI CHOCK MANIFOLD,WITH 6"OD PIPING 2 9/16" MANUAL CHOKE VALVES 2 9/16" MANUAL VALVE BEFORE EACH MANUAL CHOKE 2 9/16" MANUAL VALVE BEFORE EACH MANUAL CHOKE THE CENTRAL LINE SHOULD CONSIST OF 4 1/16"-5K MANUAL V

US$ *0833.33EA

Model/PN: CHOCK MANIFOLD 2 9/16"

Brand: SANYI

Standard: API-16C

Lead Time: 45 days

Warranty: 12 Months

Place of Origin: China

Payment Method: T/T

Application: Oilfields equipments & Spares

Packaging: Export Standard Pack

HS code: 8431499900

Purchase Quantity

Add to Wishlist

 

Product Details

Kill And Choke Manifold Description:

Choke manifold is a system of valves and chokes for controlling the flow from the well usually has two flow paths, one adjustable choke used primarily for cleaning the well up and facilities to install and change choke of fixed sizes for a more accurate flow control during main well flow periods.

Choke manifold is used during well testing, The positive choke has a fixed diameter and the size of the orifice on the adjustable choke can be varied. In addition the adjustable choke allows fixed chokes to be switched out as needed without stopping the well, increasing the flexibility of the overall system.


1. Application

Choke manifold is necessary device to control the well kick successfully and execute the pressure control technology on oil/gas well in the course of drilling, as it is, the device is adopted to execute new drilling-well’s technique of balance pressure, which can avoid pollution of oil-layer, improve the speed of drilling and control blowout effectively. One end of the device connects with the side flange of BOP spool. When BOP closes, it can control the finite pressure from casing by adjusting the choke valve’s opening, so balanced drilling can work under minimum pressure-difference.


2. Configuration
The choke manifold consists of choke valves, gate valves, line pipes, fittings, pressure gauges and other components.


3. Working Principles
When the pressure inside the well rises, opening/closing the choke valves (including manual chokes, hydraulic chokes and positive chokes) on the choke manifold can allow the release of the fluid inside the well so as to control casing pressure, which can be directly blown out through the gate valve if the casing pressure is quite high.


4. Pressure Ratings
The kill manifold is available in pressure ratings of 14MPa, 21MPa, 35MPa, 70MPa and 105MPa, and also can be available upon customer request.


5. Operating Instructions
(1) The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
(2) The choke manifold shall be installed at the place where the operator can reach it easily. The pressure test must be performed prior to installation and the seat test pressure shall be equal to the rated working pressure.
(3) The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120 degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.
(4) The pressure gauge must be installed.
(5) In winter, the choke manifold can work under a low temperature condition.

























Kill And Choke Manifold feature of Oilfield Wellhead Equipment

• Control the well fluid flow;
• specially used for tesing in oil or gas field
• Standard two flow systems: a positive choke and an adjustable choke
• Provides a means for fluid sampling, real-time pressure and temperature monitoring, and chemical injection
• Metal-to-metal, double seal to ensure reliability in harsh environments
• 15000psi adjustable nozzle adopts gear handle,reducing the operating torque;
• Positive choke is equipped with tungsten steel lining,making it twear-resisting and corrosion resistant.
• Can be customized upon customer request
• Complies with API-6A (PSL-2,PR1), NACE MR0175)

























Related Products

Model/PN:2 1/16"

GATE VALVE FOR CHOKE MANIFOLD / H-MANIFOLD ( 2 1/16" X 10 K) FLANGE X FLANGE CONNECTION

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *215.28

Model/PN:4IN

PIPE 4 IN  (114X6MM)

Brand:

Unit: M

Lead Time: 15 Days
Price(USD)

$ *9.44

Model/PN:JY-01.4.2

MANUAL DIVERSION VALVE FOR YANCHENG SANYI CHOKE MANIFOLD CONTROL UNIT UNIT MODEL JY1-35T

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *30.21

Model/PN:JYKQ-4

HAND-OPERATED PUMP FOR YANCHENG SANYI CHOKE MANIFOLD CONTROL UNIT UNIT MODEL JY1-35T

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *12.50

Model/PN:JYKL-10 -

COMBINATION VALVE FOR YANCHENG SANYI CHOKE MANIFOLD CONTROL UNIT UNIT MODEL JY1-35T

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *73.61

Model/PN:JYK-TF-15 -

REGULATOR VALVE FOR YANCHENG SANYI CHOKE MANIFOLD CONTROL UNIT UNIT MODEL JY1 35BJT

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *8.61

Model/PN:JYKQ-63 (8...

AIR-OPERATED HYDRAULIC PUMP FOR YANCHENG SANYI CHOKE MANIFOLD CONTROL UNIT UNIT MODEL JY1 35BJT

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *180.56

Model/PN:JYKX-5 -

PILOT VALVE FOR YANCHENG SANYI CHOKE MANIFOLD CONTROL UNIT UNIT MODEL JY1 35BJT

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *04.17

Model/PN:JYK-QK25

AIR CONTROLLED DIVERSION VALVE FOR YANCHENG SANYI CHOKE MANIFOLD CONTROL UNIT UNIT MODEL JY1 35BJT ...

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *12.85

Model/PN:JYKQ3-1

AIR-OPERATED F. R. L COMBINATION FOR YANCHENG SANYI CHOKE MANIFOLD CONTROL UNIT UNIT MODEL JY1 35BJT...

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *38.89

Model/PN:JYK100- 3...

VALVE POSITION INDICATOR FOR YANCHENG SANYI CHOKE MANIFOLD CONTROL UNIT UNIT MODEL JY1 35BJT

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *60.42

Model/PN:QFW-35.47 ...

AIR-OPERATED VALVE POSITION TRANSMITTER (ANGLE VALVE DRIVER) FOR YANCHENG SANYI CHOKE MANIFOLD CONTR...

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *60.42