JZG24

DEADLINE ANCHOR JZG24,240KN, 6MPA,VERTICAL,DEADLINE ANCHOR API 8C / 8A FOR DRILLING RIG SPARE PARTS, WIRE-LINE ANCHOR JZG24

US$ *604.17EA

Model/PN: JZG24

Brand: ZHONGHENG

Standard: API 8C

Lead Time: 20 days

Warranty: 12 Months

Place of Origin: China

Payment Method: T/T

Application: Oilfields equipments & Spares

Packaging: Export Standard Packing

HS code: 8431499900

Purchase Quantity

Add to Wishlist

 

Product Details

Deadline Anchors Description of Drilling Rig Spare Parts

Deadline anchors work for drilling rigs and workover rigs. Lines pull capacities from 30.000 pounds to 100.000 pounds. It can indicate and record the variation of hook load and weigh on bit in order to help driller judge the operation Status of the rig and obtain the proper drilling parameters during or well service operation.Carbon Steel Deadline Anchor API 8C / 8A Drilling Rig Spares Wire-Line Anchor 2

 

Drilling Rig Spare Parts - Deadline Anchors Features

- Various models available for deadline loads up to 200,000 pounds
- Single line pull capacities from 30,000 to 100,000 pounds to accommodate all your needs
- Bit weight indicator uses a 4:1 sensitivity movement to provide a highly accurate indication of bit weight
- Models available in a variety of sizes-from light weight models for mounting on wheel-mounted rigs and on helicopter rigs

- Max deadline load(Line pull capacity): 180 kN / 40 kLB.
- With hydraulic load sensor.
- Constructed with top-quality steel and proof-tested to 150% of rated capacity.
- Accommodate wireline sizes 1", 1-1/8" or specify.

- Designed and tested for high strength, long life and exceptional accuracy.
- Floor mount.

- In accordance with API standards. Pass API 8C Certificate, API ISO9001:2000 Certificate, API Q1 Certificate, API TS 29001 Certificate.


Related Products

Model/PN:JZ400.1-7

P/N : JZ400.1-7 , PRESS BLOCK FOR HUBEI JPIM DEADLINE ANCHOR MODEL JZG34A

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *20.49

Model/PN:GB/T93- 19...

P/N : GB/T93-1987-24 , STANDARD SPRING WASHER 24 FOR HUBEI JPIM DEADLINE ANCHOR MODEL JZG34A

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *.52

Model/PN:GB/T6170- ...

P/N : GB/T6170-2000-M24 , MODEL 1 LEXAGONAL NUT M24 FOR HUBEI JPIM DEADLINE ANCHOR MODEL JZG34A

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *.42

Model/PN:GB/T953- 1...

P/N : GB/T953-1988-M24 X 180 , EQUAL LENGTH STUD GRADE C M24 X 180 FOR HUBEI JPIM DEADLINE ANCHOR MO...

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *1.28

Model/PN:GB/T6170- ...

P/N : GB/T6170-2000-M20 , MODEL I HEXAGNOAL NUT M20 FOR HUBEI JPIM DEADLINE ANCHOR MODEL JZG34A 142...

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *.65

Model/PN:GB/T953- 1...

P/N : GB/T953-1988-M20 X 300 , EQUAL LENGTH STUD GRADE C M20 X 300 FOR HUBEI JPIM DEADLINE ANCHOR MO...

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *.16

Model/PN:GB/T5783- ...

P/N : GB/T5783-2000-M16 X 35 , HEXAGNOAL HEAD BOLT FILLY THREADED M16 X 35 FOR HUBEI JPIM DEADLINE A...

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *.69

Model/PN:JZ400.1-6

P/N : JZ400.1-6 , OIL SEAL FOR HUBEI JPIM DEADLINE ANCHOR MODEL JZG34A

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *.51

Model/PN:GB/T886- 1...

P/N : GB/T886-1986 , SHAFT SHOULDER RETAINER RING 110 X 135 FOR HUBEI JPIM DEADLINE ANCHOR MODEL JZG...

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *1.63

Model/PN:GB/T812- 1...

P/N : GB/T812-1988 , ROUND NUT M105 X 2 FOR HUBEI JPIM DEADLINE ANCHOR MODEL JZG34A

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *2.50

Model/PN:JZG41

DEAD LINE ANCHOR [DEAD LINE ANCHOR MODEL: JZG41, SUITABLE WITH WEIGHT INDICATOR MODEL: JZ500A, MAXIM...

Brand:

Unit: EA

Lead Time: 21 Days
Price(USD)

$ *9687.50

Model/PN:STEEL WIRE...

COMPLETE SET AND REPAIR KIT FOR DEADLINE ANCHOR WITH DIES FOR DRILLING LINE;ONE PAIR OF ROPE CLAMP,...

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *35.42