BLANK PIPES

DESCRIPTION: 4.5” 11.6 PPF BLANK PIPES; LENGTH: R3 (AROUND 40FT); MATERIAL GRADE: L-80; THREADS: PREFERRED NEW VAM

US$ *51.74EA

Model/PN: BLANK PIPES

Brand: DALIPU

Standard: API-5CT

Lead Time: 55 days

Warranty: 12 Months

Place of Origin: China

Payment Method: T/T

Application: Oilfields equipments & Spares

Packaging: Export Standard Packing

HS code: 8431499900

Purchase Quantity

Add to Wishlist

 

Related Products

Model/PN:MYC125T 4....

SLIPS TYPE 3-1/2" (TUBING)MOD: RT&YT - 125TON

Brand:

Unit: EA

Lead Time: 45 Days
Price(USD)

$ *079.86

Model/PN:MYC125T 4....

SLIPS TYPE 4-1/2"~5-1/2" (TUBING) MOD:MYC - 125TON

Brand:

Unit: EA

Lead Time: 45 Days
Price(USD)

$ *208.33

Model/PN:SLX150T 3....

SIDE DOOR ELEVATOR 3- 1/2" (TUBING) -150TON

Brand:

Unit: EA

Lead Time: 45 Days
Price(USD)

$ *72.22

Model/PN:SLX150T 4....

SIDE DOOR ELEVATOR 4- 1/2" (TUBING) -150TON

Brand:

Unit: EA

Lead Time: 45 Days
Price(USD)

$ *89.58

Model/PN:SLX150T 4"NU

SIDE DOOR ELEVATOR 4" (TUBING) -150TON

Brand:

Unit: EA

Lead Time: 45 Days
Price(USD)

$ *89.58

Model/PN:SJ5T 3.1/2...

SINGLE JOINT ELEVATOR 3 -1/2" (TUBING) - 2TON

Brand:

Unit: EA

Lead Time: 45 Days
Price(USD)

$ *73.61

Model/PN:SJ5T 4.1/2...

SINGLE JOINT ELEVATOR 4 -1/2" (TUBING) - 2TON

Brand:

Unit: EA

Lead Time: 45 Days
Price(USD)

$ *73.61

Model/PN:SJ5T 5.1/2...

SINGLE JOINT ELEVATOR 5 -1/2" (TUBING) - 2TON

Brand:

Unit: EA

Lead Time: 45 Days
Price(USD)

$ *99.65

Model/PN:XQ89-4.5

POWER TONG TUBING FROM SIZE 2.7” TO 4.5 “

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *909.72

Model/PN:3 1/8”

ESP TUBING HEAD ADAPTER, 11” 5000 PSI × 3 1/8” 5000 PSI, UP & BOTTOM FLANGED CONNECTION, PREPARED TO...

Brand:

Unit: EA

Lead Time: 45 Days
Price(USD)

$ *015.63

Model/PN:N-80

TUBING, 3-½” ,9.5 LB/FT ,N-80, EUE R-2 BLACK PAINT TREATMENT OF EXTERNAL SURFACE

Brand:

Unit: TON

Lead Time: 90 Days
Price(USD)

$ *362.85

Model/PN:N-80

TUBING, 2-7/8” ,6.3 LB/FT ,N-80, EUE R-2 BLACK PAINT TREATMENT OF EXTERNAL SURFACE

Brand:

Unit: TON

Lead Time: 90 Days
Price(USD)

$ *362.85