More
More
  • ABB
  • AERZEN
  • BPM
  • CANRIG
  • DINGSHENG
  • HONGHUA
  • JICHAI
  • JY
  • NANYANG
  • NOV
  • RUIHENG
  • SIDA
  • SUOHAO
  • TESCO
  • TIANHE
  • TOPLAND
  • VARCO
  • WEICHAI
  • XINBEIFANG
  • XINGXING

Model/PN:7500865

VALVE, NEEDLE

Brand:

Unit: EA

Lead Time: 56 Days
Price(USD)

$ *06.63

Model/PN:7500864

VALVE, NEEDLE

Brand:

Unit: EA

Lead Time: 56 Days
Price(USD)

$ *16.14

Model/PN:7500749

VALVE, RELIEF

Brand:

Unit: EA

Lead Time: 56 Days
Price(USD)

$ *37.89

Model/PN:7500750

VALVE, PRESS RED/REL

Brand:

Unit: EA

Lead Time: 56 Days
Price(USD)

$ *00.59

Model/PN:30179191-1

ASSEMBLY,MOTOR;TOP DRI

Brand:

Unit: EA

Lead Time: 154 Days
Price(USD)

$ *3299.69

Model/PN:10741468-001

TUBE ASSY, LUB / HEAT EXCHANGER, FOR TOP DRIVE, MODEL: TDS 11 SA, MAKE: NOV, P/N: 10741468-001

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *81.94

Model/PN:30171993

TUBE ASSEMBLY KIT, FOR TOP DRIVE, MODEL: TDS - 11SA, MAKE: VARCO, P/N: 30171993

Brand:

Unit: EA

Lead Time: 7 Days
Price(USD)

$ *177.08

Model/PN:M3K MK08

P/N : M3KMK08, GATE HOSE 75 FT. LG WITH 1/2" NPT THREADED BOTH END FOR NATIONAL OILWELL BOP HANDLI...

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *71.61

Model/PN:10947729-001

P/N : 10947729-001 , GATE HOSE 75 FT. LG WITH 3/4" NPT THREADED BOTH END FOR NATIONAL OIL WELL BO...

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *56.77

Model/PN:7005526-11

P/N : 7005526-11 , CAPSCREW 1"-8"X3" LG GRADE 5 HEX HEAD FOR NATIONAL OILWELL TOP DRIVE SYSTEM MOD...

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *.03

Prev Page12345...  138Next PageTotal 138 Pages GO