5

DOUBLE MUD WIPER D/P FOR OILFIELD WORKOVER,DRILLING DIAMETER 12MM, DRILLING DEPTH 11M, DRILLING ANGLE 2, SHAPE SIZE 33MM, VERTICAL SHAFT SPEED 44, DRILL ROD DIAMETER 55

US$ *2.57EA

Model/PN: 5"

Brand: WELLSLINK

Standard: API

Lead Time: 5 days

Warranty: 12 Months

Place of Origin: China

Payment Method: T/T

Application: Oilfields equipments & Spares

Packaging: Export Standard Packing

HS code: 8431499900

Purchase Quantity

Add to Wishlist

 

Related Products

Model/PN:D/P 2 7/8”

"WIPER D/P 2 7/8""X17"" 4-1410 SINGLE # THE ROTATING SYSTEM

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *5.14

Model/PN:D/P 3 1/2”

"WIPER D/P 3 1/2""X17"" SINGLE# THE ROTATING SYSTEM / KELL

Brand:

Unit: EA

Lead Time: 30 Days
Price(USD)

$ *5.14

Model/PN:WIPER

"WIPER D/P 2 7/8""X17"" 4-1410 SINGLE # THE ROTATING SYSTEM

Brand:

Unit: EA

Lead Time: 5 Days
Price(USD)

$ *2.57

Model/PN:WIPER

WIPER D/P 3 1/2""X17"" SINGLE # THE ROTATING SYSTEM / KELL

Brand:

Unit: EA

Lead Time: 5 Days
Price(USD)

$ *4.31

Model/PN:ID 127MM

DRILL PIPE MUD SCRAPER DRILLING PLATFORM DRILL PIPE MUD WIPER DOUBLE LAYER MUD WIPER, DRILLING DIAME...

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *2.08

Model/PN:ID 89MM

DRILL PIPE MUD SCRAPER DRILLING PLATFORM DRILL PIPE MUD WIPER DOUBLE LAYER MUD WIPER, DRILLING DIAME...

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *8.61

Model/PN:ID 67MM

DRILL PIPE MUD SCRAPER DRILLING PLATFORM DRILL PIPE MUD WIPER DOUBLE LAYER MUD WIPER, DRILLING DIAME...

Brand:

Unit: EA

Lead Time: 15 Days
Price(USD)

$ *2.57

Model/PN:4"

DRILLING MUD SCRAPER, RUBBER WIPER, DRILLING DIAMETER 12MM, DRILLING DEPTH 12M, DRILLING ANGLE 22, E...

Brand:

Unit: EA

Lead Time: 5 Days
Price(USD)

$ *.55

Model/PN:5"

RUBBER WIPER FOR DRILL PIPES, DRILLING DIAMETER 12MM, DRILLING DEPTH 1M, DRILLING ANGLE 33, DIMENSI...

Brand:

Unit: EA

Lead Time: 5 Days
Price(USD)

$ *5.59

Model/PN:3 1/2"

RUBBER DRILL PIPE WIPER, DRILLING DIAMETER 12MM, DRILLING DEPTH 2M, DRILLING ANGLE 4°, DIMENSION 34M...

Brand:

Unit: EA

Lead Time: 5 Days
Price(USD)

$ *.81

Model/PN:5"

DOUBLE MUD WIPER D/P FOR OILFIELD WORKOVER,DRILLING DIAMETER 12MM, DRILLING DEPTH 11M, DRILLING ANGL...

Brand:

Unit: EA

Lead Time: 5 Days
Price(USD)

$ *2.57

Model/PN:φ139.7mm

Φ139.7MM DRILL PIPE MUD WIPER SCRAPER, DRILLING DIAMETER 12MM, DRILLING DEPTH 4M, DRILLING ANGLE 55,...

Brand:

Unit: EA

Lead Time: 5 Days
Price(USD)

$ *1.67